Jobs Log, Past and Upcoming

Categories: Layouts.

This is a list of the jobs that are proposed to be done next time we meet. It also contains a log of the jobs that have been done in the past.

Tools

The column Tools lists the tools that are required to complete the job but are not in the possession of EMRC. Tools that the club should have will be coloured grey. If you are able to supply any of the tools listed please let Glenn know.

Note that the date is flexible. The jobs may not be completed or even started on the date listed and this will be adjusted accordingly.

Help Wanted!

If you are able to assist with the construction of the Shelf Layout you will be most welcome. Remember that the layout is for the purposes of learning, so no one will get in trouble for making mistakes! The idea is to learn and enjoy building. You will gain valuable experience in layout construction, as well as fellowship with other club members.

Now Thursday Mornings

As we have moved to Tuesday nights, some members are having problems getting the clubrooms.

To solve the problem there is an additional session on Thursday mornings depending upon the demand. Sessions during on week nights (except Monday and Tuesday) are also possible. Please contact Glenn if you can attend.


 

Job Table

Date
(each Tuesday)
Job and Description Tools Needed Status
 
  • Design signalling specification
    • Inner track will be a simple block control
    • Outer two tracks a bit more involved. Consider using microcontrollers for block and station work.
  In hand with Geoff Ca (and Rob?)
 
  • Layout electrics
    • Design control panel
    • Build control panel
  • Suggest the inner track has only one controller
    • Outer tracks are accessible by two controllers with 3 way toggle switches.
   
Sep/Oct 2010
  • Lay down track for station area
   
Sep/Oct 2010
  • Install West points, near the meeting room. One point sits across a join.
    • Need to keep the curves away from each other as much as possible.
    • Plastic sleepers need to be cut away so that the rails can be soldered to a copper strip to be laid across the join.
  • Razor saw
  • Dremel tool or similar
 
Sep/Oct 2010
  • Install East points.
    • Should be easier than the West ones.
    • Need to be staggered to avoid any point being on a join.
    • Being laid in a similar way to West points.
   
Sep/Oct 2010
  • Install girder bridge.
    • This will involve installing the Girder bridge and two concrete bridges.
  In hand with Geoff Collis
Sep/Oct 2010
  •  Build and install concrete bridge model.
    • Bridge being purchased is only one track wide. 
    • This will involve installing the Girder bridge and two concrete bridges.
  • Can be built at home or at the club room.
In hand with Geoff Collis
7/2010
  •  Lay down cork for main line only.
  • Cork is being laid down for all lines and sidings.
  • Read the article about the process here.
  • Cheap paint brush for the contact cement.
Done
6/2010
  • Finalise deck lay down. 
    • Check that modules are flush at the joins.
    • Sand with a belt or orbital sander as required.
    • May be easier to remove the baseboard and then sand the ends until they are equal in height.
  • Belt or orbital sander.
Done
5/2010
  • Lay down deck for West section. 
  • This short section needs to match the two adjacent curved sections.
  • May need to put deck down for the meeting room extension.
  Done
 9/3/2010
  • Lay down deck for North West  section, the top curved section.
    • Cutting angles need to be calculated. See Shelf Layout document.
  • Use the article on helix construction to determine the angles required.
  • Protractor or other method of marking out angles accurately.
Done
 1/3/2010
  • Lay down deck for South section.
  Done
 22/2/2010
  • Lay down deck for South section.This is the station and will take some time. May need support towards the window.
  Done
15/2/2010
  • Lay down deck for East section.
    This is a quick job, only enough is needed to support the track.
  Done
15/2/2010
  • Lay down deck for North East section.
  Done
 8th Feb 2010
  • Lay down deck for South East section.
   Done
 8th Feb 2010
  •  For North cut out sides for bridge and strengthen.
    (Partially done)
   Done
 
  • Build and fit the West module.
   Done
 
  • Build the NorthWest curved section
   Done
 
  • Build the East module. This short module needs to be fitted to the adjacent two.
   Done
   

  • Fit extensions to NorthEast
  • Fit alignment devices to both joins.
 

  • Liquid Nails
  • Spatula
  • Turps
  • Drill bits
  • 8mm drill bit
  • Screwdriver bits.
 Done
  14/09/2009
  •  Build the last curved section, NorthWest

Floor Plans

 

  • Liquid Nails
  • Gloves
  • Turps
  • Drill bits
  • 8mm drill bit
  • Screwdriver bits.
 Done
07/09/2009
  • Start NorthEast, do the North wall first, copy SouthEast except mirror it.
    As for SouthEast it needs to be extended to meet with the adjacent module.
  • Use a piece of the 10mm ply as an end, leaving space to laminate an extension onto the end.
 

  • Liquid Nails
  • Spatula
  • Turps
  • Drill bits
  • 8mm drill bit
  • Screwdriver bits.
Done
 17/08/2009
  • Fit alignment device to SouthEast and South
  • Add girders to wall section of SouthEast

 

 

  • Liquid Nails
  • Spatula
  • Turps
  • Drill bits
  • 8mm drill bit
  • Screwdriver bits.
Done
 10/08/2009  AGM, no layout construction possible Cry    
03/08/2009
  • Add on to SouthEast the piece that joins up with East
  • Complete extension to South.
  • Add girders to window section of SouthEast
  • Liquid Nails
  • Disposable gloves
  • Turps
  • Drill bits
  • Screwdriver bits.
 Done
 27/07/2009
  • Finish off SouthEast, put the inner wall piece in (the shortest length)
  • Fit the internal end (to allow for extending)
  • Use a piece of the 10mm ply as an end, leaving space to laminate an extension onto the end.
 

  • Glue bottle
  • Liquid Nails
  • Drill bits
  • Screwdriver bits.
 Done
20/07/2009
  • Start building SouthEast, beginning with the section along the window. Needs to be extended to meet with South later on.
  • Made a start but having to put screws in by hand slowed things down. Should consider getting a club owned power drill/driver.

Floor Plans

  • Glue bottle
  • Liquid Nails
  • Drill bits
  • Screwdriver bits.
 Done
13/07/2009
  • Join South module to SouthWest with joiner device
  • Drill girders for wires
  • Notch out SouthWest so that it fits on the “bar”.(This will need to be done to NorthWest as well)
  • 8mm drill bit
  • 26mm or larger spade bit
  • Drill, cordless
Done
prior to 16/7/2009
  • Construct SouthWest
  • Construct North, South
  • Shelf extenders
  • Wall brackets
   Done